Leaving the lock at Miraflores on the Panama Canal. The manoeuvre from one lock to the other takes about an hour. The process requires about 100 000 tonnes of water. Each lock gate is nine metres high and weighs 750 tonnes. The Panama Canal measures 82 kilometres and covers an area of 250 square kilometres. It usually takes six to eight hours to navigate. This waterway was opened in 1914. Since the opening of the extension, which began in 2007, on 26 June 2016, ships with 14,000 TEU can pass through it. To date, more than one million ships of all types from all over the world have used it. - 1977
Leaving the lock at Miraflores on the Panama Canal. The manoeuvre from one lock to the other takes about an hour. The process requires about 100 000 tonnes of water. Each lock gate is nine metres high and weighs 750 tonnes. The Panama Canal measures 82 kilometres and covers an area of 250 square kilometres. It usually takes six to eight hours to navigate. This waterway was opened in 1914. Since the opening of the extension, which began in 2007, on 26 June 2016, ships with 14,000 TEU can pass through it. To date, more than one million ships of all types from all over the world have used it. - 1977